Skip to main content
Solar Adviser Logo
Pune, MaharashtraMSEDCL Grid

Rooftop Solar Subsidy & Feasibility in Pune

MSEDCL residential power rates are among the highest in India (₹9-11 in high tiers). Rooftop solar in Baner, Kothrud, and Wakad breaks even within 2.8 years.

Solar Irradiance

5.4 kWh/m²/day

315 Sunny Days
Average Power Tariff

₹8.8 / Unit

MSEDCL Slab Rate
Payback Period

2.8 Years

Fast Capital Breakeven
Central CFA Subsidy

Up to ₹78,000

Direct DBT Transfer

Calculate Solar Savings for Your Pune Rooftop

Pre-calibrated for MSEDCL tariffs (₹8.8/unit) and local sun hours.

Configure Your Property

Live MNRE PM Surya Ghar calculations

2026 Rules
Premises Category

Avg Tariff: ₹8.5/unit•Sun Hours: 5.1 hrs/day

Electricity Consumption
₹1,000₹15,000₹30,000₹50,000+
4 kW

Mentioned on your DISCOM electric bill

400 sq ft

~85 sq ft needed per kW capacity

Unbiased Sizing

4.5 kWp Rooftop Solar Plant

Generates ~592 units/month • Requires 383 sq ft terrace

Capex Payback

2.8 Years

Free power thereafter
Benchmark Cost

₹2,43,000

Tier-1 DCR
Central CFA

-₹78,000

Direct DBT
State Top-Up

₹0

N/A
Net Investment

₹1,65,000

After all subsidies
Annual Savings

₹60,000 / yr

25-Yr Cumulative

₹23,46,114

Lifetime CO2 Offset

138 Tonnes

Net Capex Breakeven at Year 2.8Total Profit: ₹21,81,114
Local DISCOM Protocol

Step-by-Step MSEDCL Solar Net-Metering Process

Standard turnaround timeline: 28 working days under MNRE single-window protocol.

Step 1: National Portal Application

Register on pmsuryaghar.gov.in with your MSEDCL Consumer Account Number and mobile number.

Step 2: Technical Feasibility Approval (TFR)

MSEDCL reviews distribution transformer capacity and grants approval within 7–10 days.

Step 3: Installation & Earthing

Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.

Step 4: Bi-Directional Net Meter & DBT

Testing by MSEDCL Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.

Priority Solar Feasibility Coverage Across Pune:

PIN 411001PIN 411004PIN 411038PIN 411057PIN 411028and all municipal wards

Pune Solar Advisory FAQs

Under Maharashtra State Electricity Distribution Co. Ltd, consumers can install rooftop solar up to 100% of their sanctioned load. A bi-directional net meter is installed to record both imported and exported units. Excess generation in summer is banked on your bill to offset winter consumption.
Calculate Subsidy (₹78k)Audit Quote