Rooftop Solar Subsidy & Feasibility in Gurugram (Gurgaon)
High DHBVN slab tariffs (₹7.50+/unit) make DLF, Golf Course Road, and Sohna Road villas ideal for 5kW to 10kW hybrid solar plants with 3-year payback.
5.2 kWh/m²/day
310 Sunny Days₹7.4 / Unit
DHBVN Slab Rate3.3 Years
Fast Capital BreakevenUp to ₹78,000
Direct DBT TransferCalculate Solar Savings for Your Gurugram (Gurgaon) Rooftop
Pre-calibrated for DHBVN tariffs (₹7.4/unit) and local sun hours.
Configure Your Property
Live MNRE PM Surya Ghar calculations
Avg Tariff: ₹7.0/unit•Sun Hours: 4.7 hrs/day
Mentioned on your DISCOM electric bill
~85 sq ft needed per kW capacity
4.7 kWp Rooftop Solar Plant
Generates ~570 units/month • Requires 502 sq ft terrace
3.7 Years
Free power thereafter₹2,53,800
Tier-1 DCR-₹78,000
Direct DBT₹0
N/A₹1,75,800
After all subsidies₹47,880 / yr
₹18,59,656
132 Tonnes
Step-by-Step DHBVN Solar Net-Metering Process
Standard turnaround timeline: 25 working days under MNRE single-window protocol.
Register on pmsuryaghar.gov.in with your DHBVN Consumer Account Number and mobile number.
DHBVN reviews distribution transformer capacity and grants approval within 7–10 days.
Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.
Testing by DHBVN Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.