Rooftop Solar Subsidy & Feasibility in Ahmedabad

India's solar capital with 330+ sunny days. Seamless Torrent Power net metering synchronisation completed in under 15 days with automated digital subsidy credit.

Solar Irradiance

5.6 kWh/m²/day

330 Sunny Days
Average Power Tariff

₹6.9 / Unit

Torrent/UGVCL Slab Rate
Payback Period

3.4 Years

Fast Capital Breakeven
Central CFA Subsidy

Up to ₹78,000

Direct DBT Transfer

Calculate Solar Savings for Your Ahmedabad Rooftop

Pre-calibrated for Torrent/UGVCL tariffs (₹6.9/unit) and local sun hours.

Configure Your Property

Live MNRE PM Surya Ghar calculations

2026 Rules
Premises Category

Avg Tariff: ₹6.8/unit•Sun Hours: 5.3 hrs/day

Electricity Consumption
₹1,000₹15,000₹30,000₹50,000+
4 kW

Mentioned on your DISCOM electric bill

400 sq ft

~85 sq ft needed per kW capacity

Unbiased Sizing

4.7 kWp Rooftop Solar Plant

Generates ~643 units/month • Requires 459 sq ft terrace

Capex Payback

3.4 Years

Free power thereafter
Benchmark Cost

₹2,53,800

Tier-1 DCR
Central CFA

-₹78,000

Direct DBT
State Top-Up

₹0

N/A
Net Investment

₹1,75,800

After all subsidies
Annual Savings

₹52,464 / yr

25-Yr Cumulative

₹20,37,068

Lifetime CO2 Offset

149 Tonnes

Net Capex Breakeven at Year 3.4Total Profit: ₹18,61,268
Local DISCOM Protocol

Step-by-Step Torrent/UGVCL Solar Net-Metering Process

Standard turnaround timeline: 15 working days under MNRE single-window protocol.

Step 1: National Portal Application

Register on pmsuryaghar.gov.in with your Torrent/UGVCL Consumer Account Number and mobile number.

Step 2: Technical Feasibility Approval (TFR)

Torrent/UGVCL reviews distribution transformer capacity and grants approval within 7–10 days.

Step 3: Installation & Earthing

Mounting of DCR TOPCon/Mono PERC modules, inverter, and 3 chemical earth pits as per CEA standards.

Step 4: Bi-Directional Net Meter & DBT

Testing by Torrent/UGVCL Junior Engineer, net-meter energisation, and automatic DBT credit within 30 days.

Priority Solar Feasibility Coverage Across Ahmedabad:

PIN 380001PIN 380015PIN 380054PIN 380058and all municipal wards

Ahmedabad Solar Advisory FAQs

Under Torrent Power / UGVCL, consumers can install rooftop solar up to 100% of their sanctioned load. A bi-directional net meter is installed to record both imported and exported units. Excess generation in summer is banked on your bill to offset winter consumption.
Calculate Subsidy (₹78k)Audit Quote